Amortisation Study
As data centre facilities age, statistical equipment reliability gradually deteriorates based on historical MTBF — but replacement and refurbishment planning demands more than guesswork. ONE9 3NINE's amortisation study forecasts equipment lifecycle with analytical rigour, giving clients the information they need to preserve operational longevity without over- or under-investing.
01 — Audit
Inventory and age of equipment
02 — Analyse
MTBF, utilisation, trend data
03 — Forecast
Failure probability over time
04 — Advise
Replacement and refurbishment strategy
Years of Experience
Industries Served
Projects Delivered
Challenges We Solve
Replacement decisions shouldn't wait for failure to force them.

My DC infrastructure is old — how long will it continue to run?
An amortisation study forecasts a data centre's potential failure window based on installation date and operational history. Approximate replacement timelines and advisories can then be strategised — letting the client balance the cost of change against the benefits of new equipment, and decide when and how replacement should happen, on their own terms.

When should I replace my building infrastructure?
For buildings operational for many years, the choice between replacing infrastructure and relocating entirely is a difficult call. An amortisation report provides forecasts grounded in historical operational parameters. Trend analysis and MTBF variables carry inherent margin for error — but in the words of clients we've supported, the data is always better than no data at all.

Can I forecast equipment failure?
Amortisation studies rely on trend analysis, MTBF statistics, and utilisation data — which means some third-party information inevitably enters the calculation, carrying its own potential flaws. Even so, ONE9 3NINE has given clients meaningful peace of mind that didn't exist before — enabling measured business decisions around replacement, expansion, and capital planning.
Ready to replace infrastructure on your terms, not on its?
Speak with our consulting team about an amortisation study of your facility equipment and infrastructure.
